A project that is the epitome of perseverance and cooperation. Last year we installed a leading solar park on the site of the former FlevoNice ice rink in Biddinghuizen. Together with FlevoNice BV, Batenburg, Aton projects, GDG (Closed Distribution System Green BV), Tennet, ING and the municipality of Dronten, we had a common goal: a supply of green energy for the Netherlands. The result is the creation of a 41,5 MWp of sustainable energy project on a site of 20 hectares. That means the equivalent of 38,000 MWh of solar energy per year, enough to supply 15,000 households. The site is also equipped with a carport with a capacity of 8 MWp of solar panels.
In collaboration
FlevoNice enlisted the help of Aton Projects and Sunrock in completing this huge project. It was achieved thanks to project financing in collaboration with ING. The solar park at FlevoNice is connected to the GDG’s closed distribution system, an initiative of local farmers to connect their windparks in the region via that route, directly to the network of Tennet. This means that the local network of Liander is not overloaded and we are still able to contribute to the energy transition and climate objectives. Local participation is vital to ensuring the realisation of such a large, sustainable energy project.
Ready to contribute to a clean energy future?
Do you have any questions, feedback or other inquiries? We’re here to help!